Wednesday, September 9, 2020

Stucco work Day 4


The stucco work resumed today after a long holiday weekend and rainy Tuesday. They continued with patching.


In our gangway you can see the outline of a door that we believe must have led to a landing a few steps from the basement floor. We never had a door there.


You can also see the outline of a much larger kitchen window, also closed up before we moved in.


And when we built the back porch you could see stucco missing by the top of the rear door. They fixed that too. We think they’re doing a great job matching the texture of the stucco - a much better job than whoever did patch work for the previous owners.

No comments:

Post a Comment